Langsung ke konten utama

BIM Modeller Data Center (Cikarang)-Have experience in Data Center Construction

Gaji
Gaji tidak dicantumkan
Jenis pekerjaan
Kontrak
Diposting
Sumber
Jobstreet Indonesia (SEEK API + GraphQL)
  • kantor
Lamar di Jobstreet Indonesia (SEEK API + GraphQL) ↗

Kami akan mengarahkan Anda ke situs tempat lowongan diposting untuk menyelesaikan lamaran.

Deskripsi pekerjaan

About the role

Arbeit Group is currently supporting one of our clients in the Construction & Engineering industry to hire a BIM Modeler (MEP) for ongoing project needs in Jakarta. The role involves creating detailed 2D & 3D BIM models and coordinating across disciplines to ensure project standards are met.

Key responsibilities

  • Create detailed 2D & 3D BIM models (MEP) using Revit, AutoCAD MEP, and related tools

  • Prepare shop drawings and construction drawings for site execution

  • Perform clash detection and resolve coordination issues across disciplines

  • Ensure models comply with project standards, specifications, and regulations

  • Coordinate with BIM Coordinators, Designers, and site teams

  • Update models based on field conditions and design changes

  • Stay updated with BIM standards & tools

About you

  • Diploma / Degree in Mechanical Engineering or related

  • 2 years of experience in MEP BIM modeling (Construction projects preferred)

  • Proficient in Revit MEP, AutoCAD, BIM 360 / Autodesk Construction Cloud

  • Experience using Navisworks is an advantage

  • Strong communication skills and able to work independently & in a team

  • Knowledge of data center standards is a must

  • Experience in data center construction

Referensi: 232416 · Berlaku sampai 11 November 2026

Lowongan terkait lainnya

Lowongan serupa