Project Engineer Mechanical (Data Center Construction) - Cikarang
- Gaji
- Gaji tidak dicantumkan
- Jenis pekerjaan
- Kontrak
- Diposting
- Sumber
- Jobstreet Indonesia (SEEK API + GraphQL)
- kantor
Kami akan mengarahkan Anda ke situs tempat lowongan diposting untuk menyelesaikan lamaran.
Deskripsi pekerjaan
About the role
We're looking for a Project Engineer Mechanical to support an enterprise Data Center industry. The role is based in Cikarang, West Java.
Key responsibilities
Supervise and manage mechanical installation, maintenance, and commissioning activities
Ensure all mechanical works comply with project specifications, drawings, and industry standards
Coordinate with subcontractors, vendors, and site personnel to maintain smooth workflow
Conduct site inspections and resolve technical issues in collaboration with the engineering team
Enforce safety regulations and conduct risk assessments as required
Monitor progress, manpower, and material usage, and maintain accurate site documentation
Lead testing and commissioning prior to project handover
Train and guide site workers on mechanical best practices and safety procedures
About you
Bachelor's degree in Mechanical Engineering or related field
Minimum 2 years of experience as a Project Engineer Mechanical, must have experience in data center
Strong knowledge of mechanical systems, HVAC, piping, and fabrication work
Experience in project planning, scheduling, and coordination with internal teams, contractors, and vendors
Ability to read and interpret technical drawings, specifications, and engineering documents
Familiar with data center systems, installation, commissioning, HVAC
Proficient in engineering and documentation tools such as Autodesk AutoCAD, Microsoft Project, or other project management tools
Strong problem-solving skills and the ability to manage technical issues during project execution
Good communication and coordination skills to work with engineering teams, contractors, and stakeholders
Fluent in English
Referensi: 242623 · Berlaku sampai 13 November 2026