Project Engineer Mechanical - Data Center Construction
- Gaji
- Gaji tidak dicantumkan
- Jenis pekerjaan
- Penuh waktu
- Diposting
- Sumber
- Jobstreet Indonesia (SEEK API + GraphQL)
- kantor
Kami akan mengarahkan Anda ke situs tempat lowongan diposting untuk menyelesaikan lamaran.
Deskripsi pekerjaan
Duties & Responsibilities:
• Site preparation and co-ordination, preparation of submission documents.
• Coordinate, liaise and manage various project stakeholders including customers, consultants, sub- contractors, vendors, etc. on site to ensure project requirements are met.
• Prepare detailed drawings, specifications, and documentation for mechanical systems.
• Conduct site visits to monitor the installation and progress of mechanical systems.
• Able to communicate effective to all stakeholders.
• Prepare and create detail work schedule, manpower and resource planning.
• Select appropriate materials and equipment for mechanical systems.
• Troubleshoot and resolve technical issues that arise during design, construction, and commissioning phases.
• Able to understand Engineering drawings and perform basic engineering calculations, design, etc.
• Coordinate the safety management system on site.
• Ensure all mechanical systems comply with relevant codes, standards, and regulations.
• Follow up and reporting on the project progress.
• All other ad-hoc tasks as assigned by reporting manager.
Qualifications & Experience:
• Recognized Diploma or Degree in related field of studies.
• Possess 3 to 5 years relevant experience in the local Construction Engineering industry. Including manufacturing plant construction, Data Centre fit-out works, etc.
• Outgoing with strong interpersonal and effective communication skills.
• Ability to work independently and target oriented in a fast-paced environment.
• Ability to interact effectively with Clients, Consultants, project members and managers at all levels.
• The candidate must be Indonesian.
• Able to communicate in English
Referensi: 212437 · Berlaku sampai 8 November 2026