Quality Control Engineer - Architecture & Civil (Qc Arch/Civil)
- Gaji
- Gaji tidak dicantumkan
- Jenis pekerjaan
- Penuh waktu
- Diposting
- Sumber
- Jobstreet Indonesia (SEEK API + GraphQL)
- kantor
Kami akan mengarahkan Anda ke situs tempat lowongan diposting untuk menyelesaikan lamaran.
Deskripsi pekerjaan
KEY RESPONSIBILITIES
1. Quality criteria before work starts
Prepare and issue Quality Criteria, Inspection and Test Plans (ITP) and inspection checklists for each work package before the activity begins.
Define hold points and witness points, especially for covered works, structure, waterproofing and life-safety elements. A hold point is never bypassed.
Review contractor method statements, shop drawings and sequence for constructability before approval.
Confirm that no work starts without the required documentation package: Quality Criteria, Site Instruction and Work Permit.
2. Inspection and control on site
Daily inspection of works against IFC drawings, specifications, approved submittals and approved method statements.
Concrete works: bar diameter, spacing, lap length, cover and chairs against the bending schedule; formwork geometry, alignment and bracing; embedded items and penetrations; slump tests and cube sampling; supervision of the pour; curing regime; post-strike inspection for honeycombing, cold joints, deviation and cracking.
Waterproofing: substrate preparation, priming, membrane type and applied thickness, upstands and terminations, mandatory flood tests with recorded duration and result, protection before screed.
Geometry: setting out against benchmarks, levels, verticality, flatness and tolerances, verified with laser level, straightedge and instruments - not by eye.
Masonry, plaster, screed, tiling and stone: substrate, mix and curing, setting out of the finished pattern, joint width, lippage, movement joints, edge and junction detailing.
No covered work is closed without an approved Work Inspection Request (WIR), a release and a photographic record.
3. Design conformance and risk management
Review architectural, structural and interior drawings before construction; identify conflicts, missing details, constructability problems and durability risks.
Issue technical comments and develop junction and detail solutions together with the Architect and the As-Built/Drafter.
Assess the effect of design changes on method, sequence and work already completed, and report the consequence before the change is executed.
4. Materials, submittals and mockups
Review material submittals within one business day; verify delivered materials against the approved sample and certificate; quarantine and reject non-conforming material before it is incorporated.
Run mockups and benchmark samples. Once a mockup is approved it becomes the acceptance standard for that work.
Assess material suitability for the Bali climate: humidity, salt air, UV, monsoon rain, termites and ground movement.
5. Non-conformance and enforcement
Issue a Non-Conformance Report (NCR) within 24 hours of identifying a defect, with the requirement, the deviation and the corrective action deadline stated.
Close an NCR only with mandatory "before and after" photographic evidence.
Issue a Stop Work Order where a critical non-compliance is observed.
Track corrective actions to closure, identify root causes and escalate repeated failures of a contractor to the Construction Manager and Technical Director.
6. Acceptance and handover
Produce snag lists and punch lists, monitor rectification and verify final acceptance against the technical documentation.
Compile the quality dossier: checklists, test results, hold point releases, photo and video documentation, confirmation of as-built status.
Support the commercial team on quality-related deductions and disputed contractor claims with documented evidence.
7. Documentation and reporting
Daily Site Report uploaded by 20:00; weekly quality report on status, risks and open defects.
All site data kept on the company server according to the Common Data Environment SOP: file naming, version control, indexed photographic records.
Build and maintain the company defect library and lessons-learned base f
or architectural and civil works.
Referensi: 38844 · Berlaku sampai 13 Oktober 2026